Contract BR-3 provides for the following improvements around various second stage settling tanks at the Southerly WWTP:
- Stripping and recoating of the traveling bridges (one bridge per tank),
- Replacement of all submerged carbon steel bridge members with type 316 stainless steel members, and
- Polyurea lining of all pre-cast concrete launders, return sludge troughs and support columns.
Other miscellaneous tasks under this contract include the replacement of the traveling bridge drive systems and limited concrete repairs.
For additional information about BR-3, please contact the NEORSD Engineering Department at 216-881-6600.
|
|
|
|