In general, the work consists of furnishing all labor, materials, equipment and incidentals as necessary for the relining and/or replacement of District interceptor sewers at 18 separate project locations, totaling approximately 8,833 linear feet and ranging in size from 6 to 121 inches in diameter, reconstruction and/or replacement of manholes, and all other appurtenant work as indicated in the Contract Documents. The existing sewer materials may be brick, concrete, vitrified clay, clay tile or a combination thereof, and may be of various shapes including but not limited to circular, egg-shaped, semi-elliptical and arch-shaped. These combined sewers convey both sanitary and storm flows and are located throguhout the District's Southerly and Westerly Service Areas.
|
|
|
|
|